Hailey Cabin Project list

This is a where all the things that need to be done at the cabin can be listed so that visitors can plan to work on them if they have the inclination.  If you have something to add to the list, please submit it here or email me the project and the materials needed and I'll add it to the list.  If you've completed something, little me know too and I'll take it off the list.

 

                           

Project Materials/Tools needed Date completed
 
Repair stairs to river Cement, wood formers, rebar, etc.  
Repair screened-in porch roof Wood, shingles, etc.  
Stain/seal back porch  Water sealant or stain, brushes  
Move good fence posts from pasture to below patio Gloves  
Restock fishing equipment Fishing equipment  
Repair/replace screen doors Screen door stuff Partially done - summer 2002
     
     
Repair kitchen sink plumbing Plumbing supplies - need to measure Summer 2002 - Steve
     
Repair screens in bathroom and front porch 31" X 72" front door, 36" X 30" bathroom, screen roller, razorblade Done - Greg
     
Paint trellis behind rose bushes White paint, brushes Done - Jo Belle and Mel
     
Add 2nd coat of oil to picnic table (?) Oil? Done -  Jo Belle and Mel
     
Remove old front porch Sledgehammer, crow bars, gloves, etc. Almost done - summer 2002 Greg, Jeff, Bill
     
Landscape by front porch (east side) Hostas, mulch, dirt, gardening tools Done - Jo Belle and Bill
     
Haul trash to dump Pickups Done - Jo Belle, Jeff, Mel, Greg
     
Re-sand horseshoe pits Sand Done - Jeff
     
Bring Hopper mower for backup Hopper mower Done - Bill and Jo Belle
     
Plant azaleas on back and sides of cabin Azaleas, gardening tools Done - Bill and Jo Belle
     
Fix front door sticking Plane, belt sander, screwdriver, hammer Done - Bill, Greg, Jeff
     
     
     
     
     
     

 